Convert uncertainty into controlled records rather than letting unclear communication stay unresolved
Confirm what was actually said – distinguish formal directions, approvals and determinations from informal comments and verbal instructions
Write precise clarification requests that state the issue, contract basis, decision required, required-by date and consequence
Treat silence as a risk event – don't assume non-response means approval or rejection unless the contract expressly says so
Link communication delay to evidence – connect each missing decision to a date, program activity, impact and mitigation action
Escalate by risk, not frustration – preserve rights through factual, clause-based correspondence while supporting continued delivery
Identify the ten habits that separate defensible contract administration from exposed administration
Apply a simple check before issuing or responding to any notice
Spot early warning signs that a variation or delay claim is heading for dispute
Know exactly what to document — and when — to protect your position
Avoid the three most common mistakes that undermine a superintendent’s certification
Walk away with a one-page reference you can pin above your desk
Presented live by Dyrick Hobbs, online or face-to-face.
The full presentation to keep and revisit after the session.
A printable summary of the ten rules for your desk or site office.
Issued after the session for your professional development record.
Founder of Enginuity Training. Twenty years administering standard form construction contracts across live infrastructure and building projects in Australia.
Principal Trainer at Enginuity Training. Civil engineer, adjudicator and infrastructure leader with extensive experience administering construction contracts and resolving complex project delivery issues across Australia.
Book your seat in the next live session, online or face-to-face.
Group and corporate bookings available