Review the contractor's program as a control system, not simply a bar chart
Establish a reliable baseline for measuring slippage, mitigation and delay
Track critical path movement and float consumption as early indicators of emerging time risk
Interrogate logic changes, resequencing and delay events rather than accepting unexplained changes between updates
Test whether recovery programs and claimed progress are credible, properly resourced and consistent with actual site performance
End every review with a clear, defensible contract administration action – without taking on responsibility for the Contractor's planning, methodology or resourcing
Identify the ten habits that separate defensible contract administration from exposed administration
Apply a simple check before issuing or responding to any notice
Spot early warning signs that a variation or delay claim is heading for dispute
Know exactly what to document — and when — to protect your position
Avoid the three most common mistakes that undermine a superintendent’s certification
Walk away with a one-page reference you can pin above your desk
Presented live by Dyrick Hobbs, online or face-to-face.
The full presentation to keep and revisit after the session.
A printable summary of the ten rules for your desk or site office.
Issued after the session for your professional development record.
Founder of Enginuity Training. Twenty years administering standard form construction contracts across live infrastructure and building projects in Australia.
Principal Trainer at Enginuity Training. Civil engineer, adjudicator and infrastructure leader with extensive experience administering construction contracts and resolving complex project delivery issues across Australia.
Book your seat in the next live session, online or face-to-face.
Group and corporate bookings available